Municipal Waste-to-Energy

We offer low-carbon, integrated waste treatment for counties, turning waste into steam and fertilizer.

County Waste-to-Energy and Fertilizer Project
TFB system burns 2×150 t/d of waste, generating heat for fertilizer production and steam for sale.
Challenge:
Handle low-calorific, high-moisture waste and optimize small-scale project economics.
County Waste-to-Energy and Fertilizer Project
TFB system burns 2×150 t/d of waste, generating heat for fertilizer production and steam for sale.
Challenge:
Handle low-calorific, high-moisture waste and optimize small-scale project economics.
Construction Unit
Shaoguan XXX Energy & Environmental Protection Technology Co., Ltd.
Commissioning Time
August 2025
Project Location
Shaoguan, Guangdong Province
Technical Route
Turbulent Fluidized Bed (TFB) Gasification-Incineration Technology & Hydrothermal Carbonization Fertilizer Production Technology
Technical Parameters
7.5 t/h, 2.5 MPa Saturated Steam & 1.8 MW Thermal Oil
Treatment Capacity
2 × 150 t/d Municipal Solid Waste Incineration Lines + 50,000 t/a Organic Fertilizer Production Line + 100,000 t/a District Heating
Cooperation Mode
EPC (Engineering, Procurement, and Construction) + Operation (O) Commissioning
Purification Process
In-furnace Deacidification + SNCR Denitrification + Semi-dry Deacidification + Dry Deacidification + Activated Carbon Adsorption + Baghouse Filtration
Emission Requirements
Standard for Pollution Control on Municipal Solid Waste Incineration (GB 18485-2014), NOx < 100 mg/m³
Fertilizer system feedstock
Livestock and poultry manure
Crop straw / rice straw
Vegetable residues
Process Flow Diagram(included separately)
Customer Value
Process Flow Diagram(included separately)
Customer Value
Zhengxiangbai Banner
20 t/d Waste Project
Small-scale waste treatment supports clean villages and rural revitalization.
Challenge:
Ensure national emission compliance with online monitoring.
Zhengxiangbai Banner
20 t/d Waste Project
Small-scale waste treatment supports clean villages and rural revitalization.
Challenge:
Ensure national emission compliance with online monitoring.
Construction Unit
A Certain Construction Group Co., Ltd.
Commissioning Time
August 2025
Project Location
Xilin Gol League, Inner Mongolia Autonomous Region
Technical Route
Turbulent Fluidized Bed (TFB) Gasification Incineration Technology
Technical Parameters
Heat transfer oil: 1.0 MPa, 47.9 m³/h
Treatment Capacity
20t/d
Cooperation Mode
EPC (Engineering, Procurement, and Construction) + Operation (O) Commissioning
Purification Process
In-furnace SNCR denitrification + dry method desulfurization + activated carbon adsorption + bag filter + chimney
Emission Requirements
Pollution Control Standard for Municipal Solid Waste Incineration (GB 18485-2014)
Raw Material Types
Household waste 1
Household waste 2
Household waste 3
County Waste-to-Energy and Fertilizer Project
Zhengxiangbai Banner
Learn More About Enterprise Case Studies
Click to change
Submit